Changing the scheduling priority of an assignment

Changing the scheduling priority of an assignment

  1. In the toolbar, click the Main Menu icon (  ).
  2. From the drop-down list, under the Admin section, select Employee Maintenance.
    The Employee Maintenance screen appears in a separate tab.
    For more information, see The Employee Maintenance screen.
  3. In the employee pane, click the row of the employee you want to edit.

    For information about filtering the employee list, see Filtering employees in Employee Maintenance.
    The General tab updates with information for the selected employee.
  4. Click the Assignments tab. 
    For descriptions of the fields and controls on this tab, see Assignments tab - Employee Maintenance
  5. In the table, click the row for the assignment for which you want to change the scheduling priority.
  6. Do one of the following:
    • To raise the scheduling priority, click Move Up.

      Note: The Move Up button is available only if the selected assignment is not Order # 1 (that is, the first row in the table).

      Or

    • To lower the scheduling priority, click Move Down.

      Note: The Move Down button is available only if the selected assignment is not the last Order # (that is, the last row in the table).

The Order # changes based on the position of the assignment.

 

Related content

Editing availability
Editing availability
More like this
Editing a shift
Editing a shift
More like this
Adding an assignment to an employee
Adding an assignment to an employee
More like this
Prioritizing Jobs & Assignments
Prioritizing Jobs & Assignments
More like this
Activating and deactivating assignments
Activating and deactivating assignments
More like this
Assigning an employee to schedule groups
Assigning an employee to schedule groups
More like this