/
Manager's Planning

Manager's Planning

Report Options

OptionDescription
Display
  • Planning Period End Date—Denote the planning period through which the report will run.
  • Scheduled Hours—Select to display all Scheduled Hours on the report.
  • Display Standards-Based KBIs—Denote whether you want Standards-based KBIs displayed on the report.
  • Display Non-Productive Hours—Select to display all non-productive hours on the report.
Filter

Determine whether the information is filtered by Division/Department or by Operating Code.

  • Division/Department—Display employees by Division(s) and Department(s).
    • Summarize By—Choose the level of detail displayed in the report.
  • Operating Code—Generate a report that displays operating codes. For example, chefs from three different departments can be included in the report as compared to having to look at three different department reports.
  • Summarize by—Choose how the information will be displayed.
Display Additional KBIsSelect any additional KBIs.

Running the Report

To run the report:

  1. Choose Excel Reports from the Reports menu.
  2. Click All Excel and select Manager's Planning. The Options dialog box appears.
  3. Select a Planning Period End Date.
  4. Select or de-select Scheduled Hours, Display Standards-based KBIs and/or Display Non-Productive Hours.
  5. Select a Mode.
    1. If Division/Department:
      1. Select a Division and Department from the drop-down menus.
      2. Select a method to Summarize by from the drop-down menu.
    2. If Operating Codes:
      1. Select the appropriate Operating Codes from the list.
  6. Select any Additional KBIs from the list.


Related content

Excel Schedule
Excel Schedule
More like this
Daily Operating Report
Daily Operating Report
More like this
Employee Schedule Analysis
Employee Schedule Analysis
More like this
Labor Effectiveness Report
Labor Effectiveness Report
More like this
Manning
More like this
Requirements Report
Requirements Report
More like this