Best Available Data screen of Labor Dashboard
The Best Available Data screen of the Labor Dashboard displays the Actual and Scheduled to Standard and Projected variance.
# | Field | Description | Notes |
---|---|---|---|
1 | Breadcrumb / labor structure selector | Displays the organization level (within the labor structure) for which information is displayed. To view a different organization level, select the options in the drop-down lists and click Load. | |
2 | Load | Loads your selection from the breadcrumb and updates the information displayed on the screen. | This button is only available for selection after you change the organization level in the bread crumb field. |
3 | Metrics | Specifies the date range for which information is displayed on the screen. Options include:
| Default metric: Full Date Range |
4 | Date Range | Displays the date range for which data is displayed on the screen. The Date Range is specified in the Settings dialog box. | Read-only. |
5 | Properties | Displays the number of selected properties. Hover the mouse pointer over the information icon (Â ) for a complete list. | Read-only. |
6 | Chart / grid | Displays information for the aggregate of all selected properties within the specified time frame. To drill down to a different organization level, click the corresponding line in the chart. To sort information in the grid, click the table headers. | Default: Chart view. |
7 | Settings | Opens the Settings dialog box, where you can change the settings for the screen. | For information about configuring the screen, see Setting up Labor Dashboard. |
8 | Export | Exports the chart or grid. Options include:
| For more information, see Exporting and printing the Labor Dashboard screens. |
9 | Previous Level | Moves you up one level in the labor structure. For example, if you are view a job, clicking the Previous Level button takes you to the department. | |
10 | Data point selector | Additional data points to be displayed in the chart or grid. Select the check boxes for the data points that you want to add to the chart or grid. | Although selected data points appear on both chart and grid views, the check boxes are visible only when the chart view is selected. The View button contains the same data point options. |
11 | Summary section: gauge and table | The Variance Impact gauge and variance data table summarize the information displayed in the chart or grid section. | Unable to render {include} The included page could not be found. |