Creating Budget Lines
As noted in About Budget Lines, there are several different types of budget lines. To create your profit and loss tree, you must create budget lines. Remember that you must first Lock the structure before you can add any budget lines.
Terms & Definitions for Common Fields
Name | Denotes the name of the budget line. |
Code | Denotes an alternate short name for the budget line. Many reports need to be coded to one of the following: |
Account Code | Allows you to assign an account code to the budget line. |
Allocation Type | Allows you to specify how the budget line is allocated.
|
Factor Mode | Determines which elements of the formula have the factor applied. Factors allow you to adjust for circumstances.
|
Show % of Line based on | Allows you to determine which line is to be used when displaying the relationship with the budget line you are editing. |
Show % of Parent | Allows you to tell Unable to render {include} The included page could not be found. that you want to display the relationship between the budget line you are editing and its parent. |
Budget Line Type | Allows you to designate what type of budget line you are creating. |
Parent Line Operation | Allows you to select which operation you want to be applied to the Parent Line for this budget line. |
Creating Budget Lines
To create new budget lines:
- Determine whether the budget structure is locked or unlocked, and click the Lock/Unlock Budget Structure icon if it is unlocked.
- Right-click on the total (T) budget line you want to add a new budget line.
- Select New Budget Line from the menu. The New Budget Line screen appears.
- Enter a Name and Code for the budget line.
- Enter an existing Account Code or click on the ellipses box and choose an account from the list.
- Select an Allocation Type from the drop-down list, if appropriate.
- Select a Factor Mode (Variable, Fixed or Both).
- Click on the ellipses box and select a budget line that is to be used as the Show % of Line based on.
- Select or de-select Calculate % of Parent.
- Select the appropriate Budget Line Type for the new budget line you are creating. NOTE: The Divider budget line type is only visible if you are creating a top-level budget line.
- Click Next.
- Proceed to the sections pertaining to the specific Budget Line Type you selected in Step 10.
Creating Total Lines
To create a total line:
- Determine whether the new line should be added or subtracted from it's parent and select Add or Subtract for the Parent Line Operation.
- If you chose to allocate in Step 6 of Creating Budget Lines, click Next and proceed to About Configuring Allocations, OR click Finish if you chose not to allocate.
- If you need to add other budget lines, return to Creating Budget Lines, OR Click the Save icon if you are finished adding budget lines.
Creating Calculated Lines
To create a calculated line:
- Click Add Existing Line.
- Select the budget line to be used in the calculation.
- Determine whether the budget line is to be added, subtracted, multiplied or divided, and select the appropriate Operation to be performed. Note: This process works like an adding machine: the first operation type must be "add," from there, other lines are added, subtracted, multiplied or divided.
- Click OK.
- Repeat Steps 1-4 for each budget line that needs to be included in the calculation.
- Click the Remove Line button if you need to remove a line from the calculation.
- If you chose to allocate in Step 6 of Creating Budget Lines, click Next and proceed to About Configuring Allocations, OR click Finish if you chose not to allocate.
- If you need to add other budget lines, return to Creating Budget Lines, OR Click the Save icon if you are finished adding budget lines.
Creating Job Class Lines
To create a Job Class line:
- Select the Division, Department and Job to be used for the hours forecast.
- If you chose to allocate in Step 6 of Creating Budget Lines, click Next and proceed to About Configuring Allocations, OR click Finish if you chose not to allocate.
- If you need to add other budget lines, return to Creating Budget Lines, OR Click the Save icon if you are finished adding budget lines.
Creating KBI Lines
To create a KBI line:
- Select the KBI to be used for the forecast.
- If you chose to allocate in Step 6 of Creating Budget Lines, click Next and proceed to About Configuring Allocations, OR click Finish if you chose not to allocate.
- If you need to add other budget lines, return to Creating Budget Lines, OR Click the Save icon if you are finished adding budget lines.
Creating Market Segment Lines
To create a Market Segment line:
- Select a Market Group to be used for the rooms forecast.
- Select a Market Segment to be used for the rooms forecast. If you choose All, Budgeting will create a market segment line for every segment in the market group.
- If you chose to allocate in Step 6 of Creating Budget Lines, click Next and proceed to About Configuring Allocations, OR click Finish if you chose not to allocate.
- If you need to add other budget lines, return to Creating Budget Lines, OR Click the Save icon if you are finished adding budget lines.
Creating Revenue Center Lines
To create a Revenue Center line:
- Select the Revenue Center to be used for the rooms forecast.
- Select the Revenue Center Period to be used for the rooms forecast. If you choose All, Budgeting will create a revenue center period for every period in the revenue center.
- If you chose to allocate in Step 6 of Creating Budget Lines, click Next and proceed to About Configuring Allocations, OR click Finish if you chose not to allocate.
- If you need to add other budget lines, return to Creating Budget Lines, OR Click the Save icon if you are finished adding budget lines.
Creating Percent of Base Lines
To create a Percent of Base line:
- Select the line to be used for the Basis (the line on which the calculation will be based). NOTE: You cannot choose the line you are creating, or any lines dependent on this line, as the Basis.
- If you chose to allocate in Step 6 of Creating Budget Lines, click Next and proceed to About Configuring Allocations, OR click Finish if you chose not to allocate.
- If you need to add other budget lines, return to Creating Budget Lines, OR Click the Save button if you are finished adding budget lines.
Creating Fixed Lines
To create a Fixed line:
Fixed lines do not require any further information than that requested on the first screen, in order to be created. However, if you chose to allocate in Step 6 of Creating Budget Lines, click Next and proceed to About Configuring Allocations, OR click Finish if you chose not to allocate.
If you need to add other budget lines, return to About Configuring Allocations, OR Click the Save icon if you are finished adding budget lines.