Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Next »

A new standard set is always based on an existing standard set. 

  1. In the toolbar, click the System Setup icon (  ).
  2. From the drop-down list, select Labor > Standard Sets.
    The Standard Sets screen appears.
  3. In the lower left corner of the screen, click the Add button (  ). 
    The Add Standard Set dialog box appears.
  4. In the Name field, type the name of the new standard set. 
  5. From the Based On drop-down list, select the KBI set on which the new standard set is based. 
  6. Click Add.
    The dialog box closes, and the new standard set appears in the Standard Sets pane. The associated KBI set from the Based On standard set is copied to the new standard set. 
  • No labels