Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Next »

TK

  1. In the toolbar, click the Main Menu icon (  ).
  2. From the drop-down list, under the Administration section, select Employee Maintenance.
    The Employee Maintenance screen appears in a separate tab.
    For more information, see Employee Maintenance.
  3. In the employee pane, click the row of the employee you want to edit.

    Note: For information about filtering the employee list, see Filtering employees.

    The General tab updates with information for the selected employee.

  4. Click the Assignments tab. 
  5. Click Add.
    The Add Employee Assignments dialog box appears.
  6. In the Assignment section, click the row for the assignment for which you want to change the scheduling priority.
  7. Do one of the following:
    • To raise the scheduling priority, click Move Up.

      Note: The Move Up button is available only if an assignment is selected in the table and the assignment is not Order # 1 (that is, the first row in the table).

    • To lower the scheduling priority, click Move Down.

      Note: The Move Down button is available only if an assignment is selected in the table and the assignment is not last Order # (that is, the last row in the table).

The Order # changes based on the position of the assignment.

 

  • No labels