Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 6 Next »

I can no longer find this dialog box.

Is this a read-only dialog box for informational purposes? 

Whenever I open Work Details dialog boxes, I never see any information in the fields; is this a bug? 

FieldDescriptionNotes
Setup / Teardown Work
Desc.Description of the setup/teardown work. 
DurationDuration of the setup/teardown work.What is the default unit? Hours? Minutes? Or is this set up in configuration?
Override? 
Service Work
Desc.Description of the service work. 

#Shifts

Number of shifts required to complete the service work. 
Override? 
Shift Length

Duration of a shift required for service work.

Is each shift the same duration, or is this length an average for the shift?

What is the default unit? Hours? Minutes? Or is this set up in configuration?
Total DurationDuration of the shift.What is the default unit? Hours? Minutes? Or is this set up in configuration?
JobJob type. 
CloseButton to close the Work Details dialog box. 
  • No labels