Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 8 Next »

The Event Tasks dialog box displays information about the tasks in an event.

FieldDescriptionNotes
Event Tasks
Ignore

Select to ignore a specific task for this event.

If a task is ignored, it will not be included in labor calculations.

Use only if this task is not needed for the event.
NameName of the task.READ-ONLY.
Standard

Name of the standard associated with the task.

The standard name is the same as the task name.

READ-ONLY.
Ignore LinkSelect to unlink two linked tasks. 
Linked TaskIndicates that another task is combined with this task within a shift.READ-ONLY.
Source

Source of the task. Current source type includes only the following:

  • A—Automatically generated tasks.
READ-ONLY.
ExpectedNumber of staff needed to perform the task.READ-ONLY.
OverrideOverrides system calculation.Currently not available.
CloseCloses dialog box.READ-ONLY.
  • No labels