You can you your mouse to modify and move shifts in both the Jobs and Employees views on the Timeline Scheduling screen.

Modifying shifts

You modify, or resize, a shift to change its start and/or end times. You modify a shift when you need to lengthen or shorten its duration.

Modify a shift by dragging

  1. In the schedule pane, hover the pointer over either the left or right side of a shift bar.

  2. When the pointer becomes a double-headed arrow, click and hold the mouse button while moving the end of the bar to the desired position. 

Modifying multiple shifts by dragging

  1. In the schedule pane, hold down Ctrl and drag over a group of shifts.
    The borders of the selected shifts are outlined.
  2. Hover the pointer over over either the left or right side of any of the selected shift bars.
  3. When the pointer becomes a double-headed arrow, click and hold the mouse button while moving the end of the bar to the desired position.
    All shifts in the selected group update. 


Can also move a group using the Shift key

Moving an entire shift to another time on the same or a different day. horizontally.

-Hold Shift key while dragging. 

Moving shifts

You can move shifts horizontally along the schedule pane when you need to reschedule a shift for an earlier or later time.

Moving a shift by dragging

In the schedule pane, hold down Shift and drag a shift bar either left or right on the schedule pane. 

Moving multiple shifts by dragging

 

  1. In the schedule pane, hold down Ctrl and drag over a group of shifts.
    The borders of the selected shifts are outlined.
  2. On any of the selected shifts, hold down Shift and drag the group of shift bars either left or right on the schedule pane.
    All shifts in the selected group update. 