You can you your mouse to easily modify and resize shifts in both the Jobs and Employees views on the Timeline Scheduling screen.
Modify a shift by dragging
In the schedule pane, hover the pointer over either the left or right side of a shift bar.
When the pointer becomes a double-headed arrow, click and hold the mouse button while moving the end of the bar to the desired position.
Modifying multiple shifts by dragging
TK - Resize multiple shifts: Ctrl+click and then drag over group of shifts to select the group. Pull end or beginning point. All will resize
Can also move a group using the Shift key
Moving an entire shift to another time on the same or a different day. horizontally.
-Hold Shift key while dragging.