The Event Tasks dialog box displays information about the tasks in an event.
Field | Description | Notes |
---|---|---|
Event Tasks | ||
Ignore | Select to ignore a specific task for this event. If a task is ignored, it will not be included in labor calculations. | Use only if this task is not needed for the event. |
Name | Name of the task. |
| ||||||
Standard | Name of the standard associated with the task. The standard name is the same as the task name. |
| ||||||
Ignore Link | Select to unlink two linked tasks. | |||||
Linked Task | Indicates that another task is combined with this task within a shift. |
| |||||||
Source | Source of the task. Current source type includes only the following:
|
|
| |||||||
Expected | Number of staff needed to perform the task. |
| |||||||
Override | Overrides system calculation. | Currently not available. | |||||
Close | Closes dialog box. |
|