Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

The Timeline Scheduling screen comprises two main sections: 

  • Operations section  At At the top of the screen, this section contains controls, menus, and search fields that allow you to schedule labor and change screen views.
  • Scheduling section  Under Under the operations section, the scheduling section consists of a left pane and a schedule pane (or panes, if you are using dual-timeline view)
    • Left pane  Depending —Depending on your settings, this pane can contain a list of employees, jobs, statistics, or work content. 
    • Schedule pane  Depending —Depending on your settings, this pane can contain schedules, work content, or statistics. 

Image RemovedImage Added

When you first open the Timeline Scheduling screen, a single timeline view opens with the Job view selected.

Anchor
operations-section
operations-section
Operations section – control descriptions

ControlDescriptionNotes
Shift Operations

Image Modified

Add Shift

Opens the Add Shift dialog box.

For more information, see the following:

 

Image Modified

Undo

Undoes the most recent action.
 

Image Modified

Gear

Opens a drop-down list to select the following:

  • Copy Schedules
– Click
  • —Click to open the Copy Schedules dialog box. Use this option to copy an existing schedule from one planning period to another. For more information, see Copying schedules. 
  • Clear Schedules
Clears
  • —Clears all schedules. After selecting this option, a confirmation dialog box appears to verify that you want to clear all schedules. For more information, see Clearing schedules.
  • Clear Shifts
Clears
  • —Clears all shifts. After selecting this option, a confirmation dialog box appears to verify that you want to clear all shifts. For more information see Clearing shifts.
  • Recalculate Shifts
Recalculates
O
– Reverts back
  • —Reverts to the
autoschedule
Creates

If you clear all schedules using the Clear Schedules option, this action cannot be undone.

If you clear all shifts using the Clear Shifts option, this action cannot be undone.

The Recalculate Shifts option is used mainly by UniFocus Support and Implementation.


View Options

Image Modified

Refresh

Refreshes the views in the Timeline Scheduling screen.

This feature is helpful if you have added or edited many shifts and want to ensure that you are viewing the most current schedule that has been updated with all of your changes.

Image Modified

Top

Opens drop-down list to select the following:

Select
Select
Select
  • Select to display the Work Content timeline view.
  • Workflow View
  • Select to display the Workflow timeline view.

When using single-timeline view,

this drop-down menu allows you to select

use the view you see in the scheduling section. When using dual-timeline view, use this drop-down

menu

list to select the view for the top panes in the scheduling section.

The Work Content view applies only to event-related job standard types.

Image Modified

Bottom

Opens drop-down list to select the following:

  • Hide
If
  • —If using dual-timeline view, select to hide the bottom panes and return to the single-timeline view.
  • Job View
Select
Select
  • Select to display the Work Content timeline view.
  • Workflow View
  • Select to display the Workflow timeline view.

When using dual-timeline views, use this drop-down

menu

list to select the view for the bottom panes in the scheduling section.

The Bottom drop-down menu applies only to the dual-timeline schedule views.

The Work Content view applies only to event-related job standard types.

Image Modified

Zoom slider

Zooms in and out of the timelines in the schedule panes.

  • To zoom in, move the slider to the right.
  • To zoom out, move the slider to the left.

For more information, see Zooming in and zooming out.

 


Select Jobs and Dates

Image Modified

Job selector

Opens the Labor Selector dialog box. Use this dialog box to filter what types of job and employee groupings appear in the left pane.

For more information, see Labor Selector dialog box - field descriptions.

 


Image Modified

Calendar selection

Opens drop-down menu to select the date range that appears in the schedule pane.
 

Anchor
scheduling-section
scheduling-section
Scheduling section

You use the scheduling section to schedule labor and view work content, workflow, and statistics. This section contains two panes: the left pane and the schedule pane. If you are using dual-timeline views, there is a left and schedule pane for each view.

PaneDescriptionNotes

Left pane(s)

 


Depending on your selected view, this pane displays:

  • Jobs
– List List
  • —List of jobs.
Employees 
  • Employees—List of employees.
  • Work
Content Distributed
  • Content—Distributed and undistributed work required to complete an event.
  • Workflow
– Workflow
  • —Workflow relative to planned shifts.
Statistics 
  • Statistics—Statistics for job groups.
Information listed in this pane is READ-ONLY.

Include Page
_Read-only - FDtext
_Read-only - FDtext

Schedule pane(s)

This pane displays the timeline that correspond to the selected view in the left pane.

The appearance of the timeline in this schedule pane depends on the zoom magnification. If the zoom slider is moved all the way to the left (zoomed out), the timeline displays each day as a separate entry. If the zoom slider is moved all the way to the right (zoomed in), you see an hourly breakdown of each day. Shifts and work content appear as bars on the schedule.