The Timeline Scheduling screen comprises two main sections:
- Operations section – At —At the top of the screen, this section contains controls, menus, and search fields that allow you to schedule labor and change screen views.
- Scheduling section – Under —Under the operations section, the scheduling section consists of a left pane and a schedule pane (or panes, if you are using dual-schedule timeline view).
- Left pane – Depending —Depending on your settings, this pane can contain a list of employees, jobs, statistics, or work content.
- Schedule pane – This pane displays a schedule in a calendar format. Shifts appear as bars in line with their corresponding employees, jobs, or statistics. The position and length of the shift bar depend on the start and end time of the shift.
Image Removed
What is the default view when you open Timeline Scheduling? When I open Timeline Scheduling, the left pane defaults to Jobs and the schedule pane is empty (until I select a date range).
...
- —Depending on your settings, this pane can contain schedules, work content, or statistics.
Image Added
When you first open the Timeline Scheduling screen, a single timeline view opens with the Job view selected.
Anchor |
---|
| operations-section |
---|
| operations-section |
---|
|
Operations section – control descriptionsControl | Description | Notes |
---|
Shift Operations |
Image Modified Add Shift | Opens the Add Shift dialog box. For more information, see the following: |
- |
|
Image Modified Undo | Undoes the most recent action. |
|
|
Image Modified Gear | Opens a drop-down |
menu list to select the following: |
– Click - —Click to open the Copy Schedules dialog box. Use this option to copy an existing schedule from one planning period to another. For more information, see Copying schedules.
- Clear Schedules
|
– Clears - —Clears all schedules. After selecting this option, a confirmation dialog box appears to verify that you want to clear all schedules. For more information, see Clearing schedules.
- Clear Shifts
|
– Clears - —Clears all shifts. After selecting this option, a confirmation dialog box appears to verify that you want to clear all shifts. For more information see Clearing shifts.
- Recalculate Shifts
|
–Not sure what this does selection does because it seems to just open the Generate Schedule dialog box –Select to open –Creates - —Creates planned shifts based on the work content in the Work Content view. For more information, see Using the Work Content
|
view | If you clear all schedules using the Clear Schedules option, this action cannot be undone. If you clear all shifts using the Clear Shifts option, this action cannot be undone. The Recalculate Shifts option is used mainly by UniFocus Support and Implementation.
|
View Options |
Image Modified Refresh | Refreshes the views in the Timeline Scheduling screen. | This feature is helpful if you have added or edited many shifts and want to ensure that you are viewing the most current schedule that has been updated with all of your changes. |
Image Modified Top | Opens drop-down |
menu list to select the following: |
– Select list of jobs in the left pane.Unfilled Shifts – According to 11910, this should be removed. Need to test – Select list of employees in the left pane – Select statistics in left pane. Each statistic type is associated with a group of jobs. Click the triangle to open the list of jobs associated with the statistic type. Statistics types include:- System Planned Hours – Need to define.
- Manager's Planned Hours – Need to define.
- Scheduled Hours – Need to define.
- System Planned Coverage – Need to define.
- Manager's Planned Coverage – Need to define.
- Scheduled Coverage – Need to define.
- Coverage Percent – Need to define.
Work Content View – Select to display the undistributed work content required to complete an event- Statistics timeline view.
- Work Content View—Select to display the Work Content timeline view.
- Workflow View—Select to display the Workflow timeline view.
When using single-timeline view, |
this drop-down menu allows you to select use the view you see in the scheduling section. When using dual-timeline view, use this drop-down |
menu list to select the view for the top panes in the scheduling section. |
The Work Content view applies only to event-related job standard types. |
Image Modified Bottom | Opens drop-down |
menu list to select the following: |
– If pane schedule - timeline view, select to hide the bottom
|
pane - panes and return to the single-
|
pane schedule – Select list of jobs in the left paneShift – Select all unfilled shifts for jobs in left pane.Employee View – Select to display the list of employees in the left pane – statistics in the left pane. Each statistic type is associated with a group of jobs. Click the triangle to open the list of jobs associated with statistic type. Statistics types include:- System Planned Hours – Need to define.
- Manager's Planned Hours – Need to define.
- Scheduled Hours – Need to define.
- System Planned Coverage – Need to define.
- Manager's Planned Coverage – Need to define.
- Scheduled Coverage – Need to define.
- Coverage Percent –Need to define.
Work Content View –Select to display the undistributed work content required to complete an event- Statistics timeline view.
- Work Content View—Select to display the Work Content timeline view.
- Workflow View—Select to display the Workflow timeline view.
When using dual-timeline |
viewviews, use this drop-down |
menu list to select the view for the bottom panes in the scheduling section. | The Bottom drop-down menu applies only to the dual-timeline schedule views. The Work Content view applies only to event-related job standard types. |
Image Modified Zoom slider |
Slider to zoom zoom out of the timelines in the |
calendarschedule panes. - To zoom in, move the slider to the right.
- To zoom out, move the slider to the left.
|
selection |
|
Image Modified Calendar selection | Opens drop-down menu to select the date range that appears in the schedule pane. |
Anchor |
---|
| scheduling-section |
---|
| scheduling-section |
---|
|
Scheduling sectionYou use the scheduling section to schedule labor and view work content, workflow, and statistics. This section contains two main panes: the left pane and the schedule pane. If you are using dual-timeline viewviews, there is a left and schedule pane for each view.
Pane | Description | Notes |
Left pane(s) |
| Depending on your selected view, this pane displays: |
– List Shifts – List of shifts.Employees – List of employeesStatistics – Need more info- Employees—List of employees.
- Work
|
Content – Distributed - Content—Distributed and undistributed work required to complete an event.
|
To sort the information in this pane by either ascending or descending order, do one of the following:
- Click the header.
- Hover the pointer to the far right of the column header and select either Sort Ascending or Sort Descending.
Jobs, shifts, employees, and statistics listed in this pane are READ-ONLY.- Workflow—Workflow relative to planned shifts.
- Statistics—Statistics for job groups.
| Include Page |
---|
| _Read-only - FDtext |
---|
| _Read-only - FDtext |
---|
|
|
Schedule pane(s) | This pane displays the |
schedule for timeline that correspond to the selected view in the left pane. The appearance of the |
calendar timeline in this schedule pane depends on the zoom magnification. If the zoom slider is moved all the way to the left (zoomed out), the |
calendar timeline displays each day as a separate entry. If the zoom slider is moved all the way to the right (zoomed in), you see an hourly breakdown of each day. Shifts and |
undistributed appears appear as bars on the schedule |
.For more information on shift bars, see Shift bars - icons and action descriptionsFor more information on scheduling and working with shifts, see Working with shifts.