Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Not sure what you do with this dialog box. Similar to Service section of the work details dialog–with more details on each taskThe Event Tasks dialog box displays information about the tasks in an event.

FieldDescriptionNotes
Event Tasks
Ignore

Select to ignore a specific task for this event.

If a task is ignored, it will not be included in labor calculations.

Use only if this task is not needed for the event.
NameName of the task. READ-ONLY.
Standard? 

Name of the standard associated with the task.

The standard name is the same as the task name.

READ-ONLY.
Ignore LinkUse Select to unlink two linked tasks. 
Linked TaskIndicates that another task is combined with this task within a shift. READ-ONLY.
SourceAsk Chris or Rory. 

Source of the task. Current source type includes only the following:

  • A – Automatically generated tasks.
READ-ONLY.
ExpectedNumber of staff needed to perform the task. READ-ONLY.
OverrideOverrides system calculation.Not Currently not available.
CloseCloses dialog box. READ-ONLY.