Skip to end of metadata
Go to start of metadata

You are viewing an old version of this content. View the current version.

Compare with Current View Version History

« Previous Version 4 Next »

You can specify which jobs and date ranges you want to view in the planning period.

Selecting the planning period

  1. In the Select Jobs and Dates section, click in the date range selection (  ) field (which is right of the jobs field). 
  2. From the drop-down menu, select the date range that you want to appear in the schedule pane. This is the date range for which you are scheduling.
    The schedule pane updates to reflect your selection. 

Selecting jobs

When using the Work Content view, you can select jobs from the Labor Selector dialog box or directly from the left pane.

Selecting the job using the Labor Selector

  1. In the Select Jobs and Dates section, click in the job selection () field.
    The Labor Selector dialog box appears.
  2. Select the jobs you want to appear.
    For more information, see Labor selector dialog box - field descriptions. 
  3. Click OK.
    The left pane of the Work Content view updates with the selected job, and the column header changes to the the selected job. 

Selecting the job using the Work Content pane

  1. On the left pane of the Work Content view, hover the pointer in the far right corner of the column header.
    A drop-down arrow appears.
  2. Click the arrow.
    A drop-down menu appears.
  3. From the drop-down menu, hover the pointer over Select Job and select a job from the fly-out menu.
    The left pane of the Work Content view updates with the selected job, and the column header changes to the the selected job. 

 

  • No labels