Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. In the Select Jobs and Dates section, click in the date range selection (  ) field (which is right of the jobs field). 
  2. From the drop-down menulist, select the date range that you want to appear in the schedule pane. This is the date range for which you are scheduling.
    The schedule pane updates to reflect your selection. 

...

  1. On the left pane of the Work Content view, hover the pointer in the far right corner of the column header.
    A drop-down arrow appears.
  2. Click the arrow.
    A drop-down menu appears.
  3. From the drop-down menu, hover the pointer over Select Job and select a job from the fly-out menu.
    The left pane of the Work Content view updates with the selected job, and the column header changes to the the selected job. 
    For more information, see Controlling the Work Content view.